VALUE: £25 million
Duration: 52 Weeks
Following a successful competitive tender process, Barnfield Construction is delighted to be on-site at the ‘Catalyst’ project in Sheffield. The mixed-use development consists of 5 units with space being available in Spring 2023 ranging between 22,354 to 108,845sqft. The 19-acre site with a total gross internal floor area of 285,000sqft is dubbed South Yorkshires white-hot industrial, distribution and roadside location and is located off J33 & J34 of the M1.